Site:
|
Fielden Campus
|
Department:
|
ARAME
|
HoD:
|
Colin Ralph
|
Activity:
|
Sunday League Referee’s
|
Assessment completed
By:
|
Kassem Berraies
|
Hazard Ref No
|
Hazard
|
Who is at Risk
|
How Many
|
How Often
|
Actions Required
|
Potential Harm
|
Chance of Harm
|
Overall Risk
|
1
|
Weather
|
Equipment
|
1
|
Medium
|
Check weather days
before use
Bring water proof
coats for equipment
|
Low
|
Low
|
Low
|
2
|
Transportation of
equipment
|
Equipment
|
1
|
Low
|
I drive, therefore
its safer for transportation
|
Low
|
Low
|
Low
|
3
|
Setting up equipment
|
Me & Equipment
|
1
|
Low
|
I have planned for
me and two other colleagues to help me film, which will be easier to set
everything up
|
Low
|
Low
|
Low
|
Equipment Take out
day: 27/05/12
Completion date:
29/05/12
Equipment Hand in
date: 30/05/12
When all of the above
conditions are in place the activity is considered low risk. If not in place
then a further assessment must be carried out to determine the level of risk
Assessment Carried out
by: Kassem Berraies Signed: Date: 25/05/12